specification section 16010

specification section 16010

specification section 16010

2006 0 obj <> endobj They accommodate radial and axial loads in both directions, are easy to mount, and require less maintenance than many other bearing types. 0 }T+A&p~lA&K9V=Zp-8ysG.n{@K?zpW\{\ZZgZU%]M:z ^HsRoiSD-G[ 5#)\EENX6 Reflected ceiling plan. ADA (American with Disabilities Act). CLOSEOUT PROCEDURES Operating and Maintenance Instructions: Submit Complete Package At Least Two (2) Months Prior To Substantial Completion. c $ ) p@P ! Emergency operations. SECTION 16010 - GENERAL PROVISIONS. Provide acoustical caulking to seal the annular spaces between the sleeve and the bare pipe or pipe insulation on each end with one half (1/2) inch caulking all around the annular space. All electrical outages which will interfere with the normal use of the building in any manner shall be done at such times as shall be mutually agreed upon by the contractor and the Office of Facilities Management. In addition to the requirements specified in Division 01, indicate the following installed conditions: Conduit and wire runs between the points Equipment locations (exposed and concealed), dimensioned from prominent building lines. 1912 0 obj <>stream Trouble shooting. Mix grout according to manufacturer's printed instructions. Concrete shall be 3,500 psi twenty-eight (28) day compressive strength concrete and reinforcement bars as specified in the architectural specifications. OUTAGES For all work requiring an outage, the electrical contractor shall submit an outage request to the UMB Project Manager, using the UMB Standard Request for Outage Form which is available through the UMB Design and Construction Web Site at HYPERLINK "https://www.umaryland.edu/designandconstruction/design-and-construction-documents/umb-standard-project-forms---current-editions/" https://www.umaryland.edu/designandconstruction/design-and-construction-documents/umb-standard-project-forms---current-editions/ The existing mechanical/electrical systems shall remain operational unless turned off by University personnel during the construction of the project. Training period shall be performed within one (1), two (2) week period. DTW Works Master Specification Section 16061- Grounding -Primary Issued 2005/06/01 PART 1 GENERAL 1.1 RELATED SECTIONS .1 Section 16010 - Electrical General Requirements. Coordinate connection of electrical services. Cover temporary openings for electrical equipment to prevent the entrance of water, dirt, debris, and other foreign matter. 4. Pa>hRjf4L4)@5C'2O4)@5C'^T3}2-IT3}2-Iid>qd|'2.@5C'2& 1? mL|k; mL|%3 mL|E=j2UT362tFMf0j2fXQf62tM4)@5Ch3,IgDT362tZO4)@5Cj3,IDTme>iC5jfXqd>i?j2m4|z7j2Ou|GVvx6p+j6*|orw~~qyri{7g2a AoO{z'ZwoFOP1p(Cs&.8dnvr{x8^|\hyuba4w/Axu (p8g\n4d,K%T?Hd2nZirM0%H K y}?3S}~I4H>_yUuSxIZ C7F"T!5b~Q0; %PDF-1.5 % SECTION 16012 -- SUBMITTALS CONTRACTOR'S CERTIFICATION: Each submittal shall contain a certification stating that the . Using the UMB Standard O&M Manual Template referenced in Division 01 Closeout Procedures insert the submittal files include both a bookmark and tree structure for accessing each submittal file in the manual. Deep groove ball bearing. .2 This shall generally include work in the following areas: Timkens deep groove ball bearings deliver reliable performance in a wide range of applications and conditions. 2. Place grout around anchors. Specifications and Drawings are prepared in abbreviated form and includes incomplete sentences. hb```b````a``eg@ ~f(0wPN A8.I.qk``Fx6I specifications electrical metallic tubing (emt) t&b detailed specifications for electrical items technical specifications for electrical work, electrical specifications - mouser electronics, electrical specifications & selection guide - delco remy, 2006 introduction to electrical construction specifications, standard in progress edition electrical specifications , electrical specifications manual override, electrical specifications & selection guide, electrical accessories and specifications, specifications for electrical installations, master specifications division 26 - electrical, general specifications for electrical installations, general specifications for electrical works, installation, specifications, service, electrical diagrams. PROTECTION OF WORK Protect work, material and equipment from weather and construction operations before and after installation. %PDF-1.5 % <<8444751DFCD0354687F9FE76EBE71065>]>> Reference letters from minimum of three (3) registered professional engineers, general contractors, building owners, explaining proficiency, quality of work, or other attribute on projects of similar size or substance. Comply with the following requirements: Coordinate electrical systems, equipment, and materials installation with other building components. Emergency Power. Remove and replace defective Work. trailer @W|$" Arrange for chases, slots, and openings in building structure during progress of construction to allow for electrical installations. Cutting, welding and burning Concrete housekeeping pads Grouting Protection of work Provisions for access Demonstration and instruction Equipment provided under another division or by others Record drawings Closeout procedures Inspections Demolition Repairs and restoration of surfaces and finishes Final cleaning Project punchout Summary of Work: Provide a complete integrated electrical system in accordance with the intent of these specifications and the accompanying drawings. Maximum length: (six 6) feet, except where fished. Provide forms for placement of grout, as required. Each and every punch list item shall be initialed and dated by the Contractor when the work is complete. SUBMITTALS General: For general requirements see Architectural Specification Division 01 Section "Submittal Procedures". Narrow Section Ball Bearings (16000, 16100). Before initiating any work, a job specific work plan must be developed by the contractor. 0000001264 00000 n Follow supported equipment manufacturer's setting templates for anchor bolt and tie locations. uI0b}q:_H:N=1pC_$;1j8OP$\;MX=+M36XzN6>t+u>fct1*l{m pe The layered electronic files shall allow building elements, building systems and sub systems to be viewed in isolation or in combinations that are user selectable when the drawing files are being displayed. hbbd``b`q @`W@qD%XAWH12N@ M Refer to specification Section 16010 - "Basic Electrical Requirements: for complete work scope. FINAL CLEANING General: General cleaning during construction is required by the General Conditions and included in Section Temporary Facilities. In general, work includes, but is not limited to, the following: Remove all electrical clippings, wiring, nuts, bolts, etc. Coordinate installation of identifying devices after completing covering and painting where devices are applied to surfaces. 0000003026 00000 n Ends shall be capped with push plugs for future use. Unless otherwise specified, outages of any services required for the performance of this contract and affecting areas other than the immediate work area shall be scheduled at least ten days (10) days in advance with the Office of Facilities Management. HWYsF~-*e{+*f4yHtOMR[.Sdh0~qzu8Udil;GiY"%g9'qn+6}Wj}=njO7lgcE}1- V. Packaging: Premixed and factorypackaged. NETA (National Electrical Testing Association). Refer to Division 01 Section "Definitions and Standards" for definition of "experienced Installer." Any conduit abandoned in concrete slabs, walls, or other inaccessible locations shall be left with a nylon pull wire. endstream endobj 2010 0 obj <>stream DIVISION 16 SECTION 16010 ELECTRICAL BASIC ELECTRICAL MATERIALS AND METHODS 16010 - 1 PART 1 - GENERAL 1.01 CONTRACT DOCUMENTS A. APPROVED EQUAL EQUIPMENT LAYOUTS Approved Equal Equipment Layouts: The equipment layouts and the related mechanical and electrical service connections, access space and supports indicated on the construction documents represent equipment provided by the specified basis of design manufacturer and model number. 3. Browse Part Number 16010, Narrow Section Ball Bearings (16000, 16100) in the The Timken Company catalog including Part Number,Item Name,Description,Clearance,Bore Size d,Features,Outside Diameter D,Outside Ring Width B,Radius Rs min,Cr - Dynamic Load REPAIRS & RESTORATION OF SURFACES AND FINISHES: Restore all finishes, equipment and surfaces to original condition, where affected by the work. In addition to the above statement the Guarantee/Warranty Period shall include all labor cost related to all warranty work. Permit must be approved by UMB Department of Operations and Maintenance prior to performing energized work. This category only includes cookies that ensures basic functionalities and security features of the website. Section 16010 General Electrical Provisions Section 16120 Wire and Cables Section 16130 Wiring Devices Section 16160 Pilot Devices . EN. WORK PERFORMANCE All electrical work must comply with the requirements of NFPA 70 (NEC), NFPA 70B, NFPA 70E, OSHA Part 1910 subpart J, OSHA Part 1910 subpart S and OSHA Part 1910 subpart K in addition to other references required by the contract. No additional compensation will be made to the contractor as a result of his failure to familiarize himself with the existing conditions under which the work must be performed. hb```,G@(b``oI All work in Divisions 26, 27, and 28 shall comply with the latest version of following codes and regulations as adopted by the State of Maryland and the State Fire Marshal, unless otherwise specified. #Zkh f9\!A>V=#JM;:Dw. COMAR (Code of Maryland Regulations). Clearances for servicing and maintaining electrical equipment. The work descried hereunder shall be installed subject to the Contractual Conditions for the entire Specifications. shall meet the requirements of the associated spec section(s). Unless otherwise indicated the coordination drawings, including plans, sections, and elevations shall be prepared at a scale of not less than 1/4 inch = 1 foot- 0 inches. Provide and maintain temporary partitions or dust barriers adequate to prevent the spread of dust and dirt to adjacent areas. 264 15 ph p he h;F B* %%EOF Shutdown. Verify all dimensions by field measurements. COORDINATION DRAWINGS General: When required participate in the preparation of the coordinated drawing effort for the project. 904 0 obj <>stream 11261 0 obj <> endobj o}B UJV5tM|w{&3cO*vnIg\6u(A2(^`h``h` @y40u@$X #X(Rp@1f startxref 2 0 obj Housekeeping Pads: Pads shall be minimum of four (4) inches wider and longer than structural base of equipment being set on pad. This Section of the Specifications and its accompanying Drawings are made [l*/ 0 All adjustments and modifications shall be provided by the bidder and appropriate subcontractors at no additional cost to the project. endstream endobj startxref Install electrical equipment to facilitate servicing, maintenance, and repair or replacement of equipment components. Cut, remove and legally dispose of selected electrical equipment, components, and materials as indicated, including but not limited to removal of electrical systems and equipment as indicated on the drawings and specifications and other electrical items made obsolete by the new Work. As much as practical, connect equipment for ease of disconnecting, with minimum of interference with other installations. As part of instruction for operating equipment, demonstrate the following procedures: Start up. Upon written instructions from UMB, uncover and restore Work to provide for UMB observation of concealed Work. DTW Works Master Specification Section 16061 - Studylib 4284 0 obj <>stream Single strip, continuous, flexible interlocked, double-wrapped steel, galvanized inside andoutside, forming smooth internal wiring channel. endstream endobj 2007 0 obj <>/Metadata 75 0 R/Outlines 81 0 R/PageLayout/OneColumn/Pages 1999 0 R/StructTreeRoot 196 0 R/Type/Catalog>> endobj 2008 0 obj <>/Font<>>>/Rotate 0/StructParents 0/Type/Page>> endobj 2009 0 obj <>stream <>>> XB^c*x=.l0 r UMB Energized Work Permit: A UMB Energized Work Permit is required for any work on energized circuits or equipment. FIRE STOPS &SMOKE SEALS FOR WALL & FLOOR SLEEVE APPLICATIONS General: Provide fire stops, and smoke sealant materials for all electrical services penetrating through rated assemblies. 590 0 obj <>stream This website or its third-party tools use cookies. SECTION 16010 - BASIC ELECTRICAL REQUIREMENTS SECTION 16111 - CONDUITS SECTION 16118 - DUCTBANK SECTION 16121 - MEDIUM VOLTAGE CABLE SECTION 16123 - BUILDING WIRES AND CABLES SECTION 16130 - BOXES SECTION 16140 - WIRING DEVICES SECTION 16160 - ENCLOSURES SECTION 16170 - GROUNDING AND BONDING SECTION 16180 - EQUIPMENT WIRING SYSTEMS SECTION 16190 Coordination Effort: This coordination effort shall include detailing major elements, components, and systems of electrical equipment and materials in relationship with other systems, installations, and building components. 1.01 . provided by the general contractor and/or his subcontractors shall be guaranteed and warranted to be free from defects in workmanship and materials for a period of two (2) years after date of certificate of completion and acceptance of work by UMB. 3 electrical and mechanical specifications, specifications for electrical unit substation . The Contract Documents are a single integrateddocument, and as such all Specification Sections apply. hbbd```b``+XLVH&06K 0&_d9;H2b&Ff=~ 90 Fire rated wall and floor penetrations. Environmental Sustainability Prospective subcontractors under this section are cautioned that the unauthorized operation of electrical equipment or other control devices by their personnel can result in extremely serious consequences for which the contractor will be held accountable. IL?nL"a n[. Single row deep groove ball bearings are particularly versatile, have low friction and are optimized for low noise and low vibration, which enables high rotational speeds. Listing and Labeling: Provide products specified in this Section that are listed and labeled. Shop Drawings: pdf file format. Wall Pipe Sleeve Applications: Pipe sleeves shall be required for all new conduit penetrations through rated wall assemblies and non-rated CMU walls. This website uses cookies to improve your experience while you navigate through the website. containing a completed specification Section 17015 will be automatically considered unresponsive and will be rejected. left on top of ceilings and ceiling tiles. 0000002433 00000 n Also include the address, phone number and contact person for each supplier. Obtain all necessary permits from Coordinate the installation of required supporting devices and set sleeves in poured in place concrete and other structural components as they are constructed. Notify UMB in advance of scheduled inspections. Control. General Specification for Electrical Works Abu Dhabi Sewerage Services Company ADSSC/GSEW Division 16 Section 16010 Electromagnetic Compatibility (EMC) Rev: 02 Jan. 2011 Page 6 of 7 6. Where access is by means of lift out ceiling tiles or panels mark access each panel using small color coded or numbered tabs. SECTON 16010 - GENERAL PROVISIONS 16010 - General Provisions.doc PART 1 GENERAL 1.01 Work Included .1 Provide all labour, materials, equipment, services and supervision required to provide a complete electrical system as listed herein and shown on the drawings. Shop drawings detailing fabrication and installation requirements for electrical equipment. The operation of electrical equipment; required to achieve an outage must be accomplished by University personnel only. This includes but is not limited to updating Equipment and/or Material Model Numbers indicated in the specifications and adding any additional specifications that may be required by the project. Division 16 Electrical SECTION 16010 - GENERAL PROVISIONS After such approvals, the CONTRACTOR shall submit the CADD- generated as-built originals, three (3) sets of prints and two (2) sets of electronic files to the CONSULTANT, as well as three (3) sets of operating and maintenance instructions, equipment and parts lists, including addresses of Copy of Maryland Master Electrician's License. NECA Standards of Installation DELIVERY, STORAGE, AND HANDLING Deliver products to the project properly identified with names, model numbers, types, grades, compliance labels, and other information needed for identification. Identification systems. File Format: Coordination drawings shall be in a layered structure form as CAD Files or PDF Files for each floor with searchable text as follows: File Structure: The pdf or dwg files shall have separate layered structure for: Building Elements: Indicate each building element on separate layers, such as: Walls. Maintenance agreements and similar continuing commitments. NJ j5)'~# 4"{:k[k%nK0Er`@ Patch existing finished surfaces and building components using new materials matching existing materials and experienced Installers. endstream endobj 11262 0 obj <>/Metadata 429 0 R/Outlines 455 0 R/PageLayout/OneColumn/Pages 11222 0 R/StructTreeRoot 1524 0 R/Type/Catalog>> endobj 11263 0 obj <>/Font<>>>/Rotate 0/StructParents 0/Type/Page>> endobj 11264 0 obj <>stream Section 16010 Basic Electrical Requirements Part 1 - General Also turn off Underlines.) to a point below the finished floors or behind finished walls and cap. B. Approved substitutions, Contract Modifications, RFI responses and actual equipment and materials installed. endstream endobj 572 0 obj <> endobj 573 0 obj <> endobj 574 0 obj <>stream Supplementary Conditions and Division-1 Specification Sections, apply to this Section. 16010 - Deep groove ball bearings | SKF Variable frequency drives. Unless otherwise indicated in each specification section, contractors may submit material and equipment by non listed manufacturers provided said submittals meet the requirements of these specifications. Supplementary Conditions and Division-1 Specification Sections, apply to this Section. %PDF-1.6 % PDF SECTION 16010 GENERAL REQUIREMENTS PART 1 - GENERAL 1.1 Description A. 1. REFERENCED ORGANIZATIONS AND CODES The following list of abbreviations are included within the specifications and are provided as a reference. Remove conduit, hangers, supports, etc. hmo .1 .2 ANSI/IEEE 837, Qualifying Permanent Connections . @ B F G c h j ~~vi^S~Hh"S{ h0$n CJ aJ hf h;F B* %%EOF Cleaning. %%EOF Effective energy utilization. Remove and replace Work not conforming to requirements of the Contract Documents. 0000005420 00000 n CONCRETE HOUSEKEEPING PADS Provide concrete required for housekeeping pads under Division 23 unless otherwise noted. See Architectural Specification Division 07, Section Penetration Firestopping for sealant material requirements. B. endstream endobj 265 0 obj<> endobj 266 0 obj<>/Encoding<>>>>> endobj 267 0 obj<> endobj 268 0 obj<>/ProcSet[/PDF/Text]/ExtGState<>>> endobj 269 0 obj<> endobj 270 0 obj<> endobj 271 0 obj<> endobj 272 0 obj<> endobj 273 0 obj<> endobj 274 0 obj<> endobj 275 0 obj<> endobj 276 0 obj<>stream F. Supply Voltage GUARANTEE/WARRANTY: All materials, equipment, etc. Out of these cookies, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. PDF DIVISION 16 - ELECTRICAL SECTON 16010 - GENERAL PROVISIONS Table of SECTION 16010 - GENERAL PROVISIONS SECTION INDEX 1.0 General Conditions 12.0 General Description 13.0 Work Included 24.0 Codes, Inspection, Permits and Fees 35.0 Record Drawings 36.0 Shop Drawings, Samples and Other Submittals 47.0 Coordination 58.0 Minor Modifications 59.0 Guarantee 6 10.0 Approvals, Substitutions, Etc. Avoid air entrapment when placing grout. INSTALLERS QUALIFICATIONS Electrical Installer shall submit the following evidence: Five (5) comparable completed projects. Coordinate requirements for access panels and doors where electrical items requiring access are concealed behind finished surfaces. Provide an index chart for identification. CUTTING, WELDING, BURNING Before the contractor and/or any sub-contractor commences any cutting, welding, burning or other type of hot work at UMB, the contractor shall contact the UMB Fire Marshals Office located @ 620 W. Lexington Street, 6th Floor, Room 6113 or by phone @ 1-410-706-3494 to obtain a hot work permit. New Construction: All new penetrations shall be provided with a pipe sleeve and sealant materials. Listing and Labeling Agency Qualifications: A Nationally Recognized Testing Laboratory (NRTL) as defined in OSHA Regulation 1910.7. Submit the work permit with the outage request. Provide the following, where applicable, in accordance with accepted trade standards and to Owners satisfaction: Replace damaged ceiling tiles. END OF SECTION 260000 University of Maryland, Baltimore Bressler Research Building Seventh Floor Renovation Project No. 1 0 obj OSHA (Occupational Safety & Health Act). Prepare reflected ceiling plans to coordinate and integrate installations, air outlets and inlets, light fixtures, communication systems components, cable trays, sprinklers, access doors and other ceiling mounted items. Hazards. Conform to arrangements indicated by the Contract Documents, recognizing that portions of the Work are shown only in diagrammatic form. Part Number 16010, Narrow Section Ball Bearings (16000, 16100).

Genuine Mercedes Seat Covers, Andrew Keegan Obituary 2020, Articles S


specification section 16010Hola
¿Eres mayor de edad, verdad?

Para poder acceder al onírico mundo de Magellan debes asegurarnos que eres mayor de edad.